
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
Solid-core sensors force destructive installation: cut cables, de-energize panels, rebuild circuits. Each swap takes 1-3 hours of downtime (CR Magnetics cites $2,400/hr avg. for auto plants). Worse, their rigid cores crack under vibration—Camille Bauer’s lab tests show 63% failure after 50 thermal cycles. Recurring costs pile up:
Labor: 3+ techs for safe reinstallation
Lost production: 2-4 hour shutdowns per sensor
Inventory: Stocking multiple solid-core sizes "just in case"
Split Core Current Sensors attack maintenance overhead through design:
Zero Downtime Retrofits
Snap-on installation (audible "click" confirms seating, per Camille Bauer SC30) avoids shutdowns. EV charger sites report 94% faster sensor swaps vs. solid-core.
Hardened for Harsh Environments
Epoxy-potted cores (SCTK667D series) resist dust/moisture, while UV-stable ties prevent cable slippage in solar farms. Result: 5x longer service intervals in outdoor sites.
One Sensor, Multiple Loads
With 0.5-5000A range (SCTK732A), one model replaces 8+ solid-core variants. Legrand’s data shows 30% inventory reduction after standardization.
Problem: 12 solid-core CTs failing annually in corrosive zones
Solution: IP67-rated Split Core Current Sensors (HFA01-1 series)
Results:
Install cost: Saved 21 labor hours/year ($5,880)
Downtime avoidance: $18,200/year
Replacement spend: Dropped 60% (from $2,100 to $840/yr)
Payback period: 14 months
Not all split cores are equal. Beware:
Fragile cores: Low-cost models (e.g., YHDC SCT013) shatter if dropped
Accuracy drift: >1% error after 200 cycles in unbranded units vs. 0.2% in Legrand’s IEC-certified CTs
Output mismatch: 333mV models confuse PLCs expecting 4-20mA (always verify output type!)
- Epoxy encapsulation → Weather/chemical resistance - Permalloy cores → Stable accuracy in -40°C~85°C - DIN rail mounts → Tool-less swaps (CR Magnetics style):cite[1] - 4-20mA/Modbus outputs → PLC/SCADA compatibility
Modern splits like DitroniX’s IoT-ready CTs feed real-time degradation alerts to CMMS systems. Predictive maintenance cuts costs further: one wind farm reported 52% fewer emergency callouts after deployment.
Stop paying for downtime.
Split Core Current Sensors transform maintenance from a cost center to a efficiency driver. Request your ROI projection kit: sales@ferrtx.com.
Let's get in touch.
About Us
Related Products List
Contact Us
Send Inquiry
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
Fill in more information so that we can get in touch with you faster
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.